Version history and rollbacks

Every change is a saved version. Roll back, restore, or compare any version with a click.

ClickFunnels AI saves a new version every time the AI makes a change, and every time you save an edit of your own in the visual editor. So if a change goes sideways — or you just want to undo something — you can roll back in two clicks.

Your saved version is available for restore as soon as the build finishes. You do not need to wait for any additional backup copy before restoring it.

Opening the history panel

Click your app's name at the top left of the editor and choose Version history. You can also open it from Settings in the Dashboard. The version history window opens.

For the most common case you don't need the window at all: each finished build card in the chat has Undo (on the latest one) or Restore (on earlier ones).

Each entry shows:

  • The version number
  • What changed (a one-line summary)
  • When the version was created
  • Preview and Restore buttons
  • A bookmark icon, so you can mark versions worth keeping. Bookmarked versions also appear under their own tab.

The current version is marked Current at the top. Anything below it is older.

Rolling back

Click Restore on any version. Before you confirm, the window lists the later changes that going back will undo. The editor then reverts the preview to that exact state. Try it out — if you like it, leave it. If not, click Restore on a different version, or your most recent one to undo the rollback.

Rollbacks are non-destructive — they don't delete future versions. You can always jump back forward.

Undoing an edit you made yourself

When you change something yourself in the visual editor and save it, that save is a version too. It is named after what you changed, for example: Changed Old headline to New headline.

To take it back, click Undo last change on its card in the chat. It takes one click, with no confirmation, and it uses no credits. The preview updates a moment later. The undo is saved as a new version, so nothing is deleted. Click Undo last change again to put your edit back.

If a build is running, wait for it to finish and then undo. If the page changed after your edit, the undo says so and opens Version history so you can pick the version to go back to.

Checking a version before you restore it

The preview always shows your current editor copy, not an older version, so you can't use it to look at an older version. To try an older version, restore it. Restoring is free, saves it as a new version, and leaves the later versions in your history, so you can restore a newer one if you change your mind.

When to roll back

  • The AI misunderstood and rewrote something you liked
  • A change broke the app and you're not sure why
  • You want to try something different but keep an escape route
  • You published a bad version and need to revert

What happens when you publish a rollback

Restoring a version only affects your preview. To make it live for users:

  1. Restore the version in the editor
  2. Click Publish in the top right
  3. The live version updates within a few minutes

Existing users see the rollback on their next page refresh.

Limits

Every version stays in your history list. A very old version can stop being restorable: it stays in the list, but its Restore button is turned off. Bookmarked versions always stay restorable, so bookmark any version you may want to go back to.

Was this helpful?

Thanks for the signal — it helps us improve the docs.

More in Building apps

How to ask the AI for changes

Better prompts get better results. The short guide to writing requests the AI nails on the first try.

What the AI can — and can't — do

Realistic expectations for what you can build with ClickFunnels AI, what the AI handles, and where you might hit limits.

Where did plan mode go?

The Plan / Build toggle is gone. To talk something through without changing your app, just say so — "don't change anything yet" works.

Still need help?

If this didn't answer your question, our team is one click away.